Yuen Long South Development Stage 1 Works and Stage 2 Works, Phase 1

Project Number:

7817CL and 7872CL

Brief Description of Project Scope:

The project mainly covers:-

(a)   site clearance and formation (including land decontamination works) for about 11 hectares of land, together with the provision of associated engineering infrastructure, to ready these formed land for subsequent development of public housing, multi-storey buildings for brownfield operations and village resite areas, and for construction of the proposed infrastructure works in paragraph (b) below;

(b)   engineering infrastructure works including reconstruction of the existing Tong Yan San Tsuen Interchange, local roads, sewerage, drainage, water supply, landscaping, common utility tunnel, electrical and mechanical and associated works; and

(c)    environmental mitigation measures and the environmental monitoring and audit programme for the works mentioned in paragraphs (a) and (b) above.

Project Office in Civil Engineering and Development Department:

West Development Office (Enquiry: 2158 5680)

Consultant:

Agreement No. CE 32/2017 (CE) - "Yuen Long South development - stage 1 - Design and Construction"
- AECOM Asia Company Limited

Agreement No. CE 58/2019 (CE) - "Yuen Long South development - stage 2 works, phase 1 - Design and Construction"
- AECOM Asia Company Limited

Approved Project Estimate:

$2,372.3 Million (7817CL)
$4,867.2 Million (7872CL)

Current Progress:

Works commenced in August 2022.

Contract:

Contract No. YL/2021/03

Scope: The works mainly include site clearance and formation (including land decontamination works) for about five hectares of land, together with the provision of associated engineering infrastructure; construction of a single two-lane carriageway of about 130 metres long connecting to Lam Tai West Road; construction of a single two-lane carriageway of about 130 metres long connecting to Long Hon Road; construction of associated works including footpaths, slopes, retaining wall, landscaping works, water supply system, sewerage system and drainage system; and implementation of environmental mitigation measures for the works mentioned above.
Commencement Date:  29 August 2022
Completion Date: 2025
Contract Sum: $132 million
Contractor: Tung Lee Engineering Co.

Other Related Information:

Gazette Date Subject

18 March 2022

&

25 March 2022

Authorization

26 March 2021

&

1 April 2021

Works Scheme