Disclaimer
The "Sample Particular Specification for Soil Nailing Works" and "Guidance Notes on Current Procedures on Supervision of Soil Nailing Works" have been prepared by the Landslip Preventive Measures Division 3 for the sole and specific use of the Civil Engineering and Development Department. Any other persons who use any information in these documents do so at their own risk.
| Item No. | Title of Document |
|---|---|
| 1 | Sample Particular Specification for Soil Nailing Works (18KB) |
| 2 | Appendices to Sample Particular Specification for Soil Nailing Works (2.56MB) |
| 3 | Guidance Notes on Current Procedures on Supervision of Soil Nailing Works (150KB) |
| 4 | Appendices to Guidance Notes on Current Procedures on Supervision of Soil Nailing Works (1.77MB) |