Forecast of Engineering and Associated Consultancies

Forecast of Engineering and Associated Consultancies
PWP Item No.
Title & Description of Assignment Type of Agreement Date of Inviting Expression of Interest Expected Duration Name and Tel. No. of Contact Person Preliminary Consultant Category (Preliminary Consultant Group) Preliminary Complexity (Normal/ Complex)

-

Management and Operation of Public Works Regional Laboratory (Tin Shui Wai) to Provide Fill Compaction Control and Other Construction Materials Compliance Testing Services – Design and Construction

DC

2018 Q3

50 months

Mr. M. K. LEE
2305 1105

GE
(Group 2 / 3)

Normal

-

Management and Operation of Public Works Regional Laboratory (Tai Po) to Provide Fill Compaction Control and Other Construction Materials Compliance Testing Services - Design and Construction

DC

2018 Q3

50 months

Mr. M. K. LEE
2305 1105

GE
(Group 2 / 3)

Normal

5101CX

Relocation of Public Works Central Laboratory to Caverns - Feasibility Study

FS

2018 Q3

24 months

Mr. Patrick
K. S. CHAU
2760 5780

GE
(Group 3)

Complex

7100CX

Preliminary Technical Review on Potential Sites in Yuen Long Areas 13 and 14 for Housing Development
(NEC PSC)

FS

2018 Q3

18 months

Ms. Y. Y. NG
2158 5617

CE
(Group 2)

Normal

7100CX

River revitalisation and flood attenuation facilities for Hung Shui Kiu New Development Area - Feasibility Study
(NEC PSC)

FS

2018 Q3

24 months

Ms. Wilda
H. Y. LEE
2158 5620

DS
(Group 3)

Complex

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package A, Landslip Prevention and Mitigation Works - Investigation, Design and Construction

I, DC

2018 Q3

69 months

Mr. Chris
C. W. CHAN
2760 5773

GE
(Group 2)

Normal

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package B, Landslip Prevention and Mitigation Works - Investigation, Design and Construction

I, DC

2018 Q3

69 months

Mr. Chris
C. W. CHAN
2760 5773

GE
(Group 2)

Normal

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package C, Landslip Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Hong Kong Island West - Investigation, Design and Construction

I, DC

2018 Q3

75 months

Mr. Chris
C. W. CHAN
2760 5773

GE
(Group 2 / 3)

Complex

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package D, Landslip Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Hong Kong Island East - Investigation, Design and Construction

I, DC

2018 Q3

75 months

Mr. Chris
C. W. CHAN
2760 5773

GE
(Group 2 / 3)

Complex

5101CX

Study on Concrete Supply in Hong Kong – Feasibility Study

FS

2018 Q3

18 months

Mr. Roy
K. C. HUNG
2716 8686

CE
(Group 2 / 3)

Complex

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package E, Landslip Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Mainland East (North) - Investigation, Design and Construction

I, DC

2018 Q4

75 months

Mr. Chris
C. W. CHAN
2760 5773

GE
(Group 2 / 3)

Complex

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package F, Landslip Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Mainland East (South) - Investigation, Design and Construction

I, DC

2018 Q4

75 months

Mr. Chris
C. W. CHAN
2760 5773

GE
(Group 2 / 3)

Complex

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package G, Landslip Prevention and Mitigation Works - Investigation, Design and Construction
(BIM)

I, DC

2018 Q4

91 months

Mr. Chris
C. W. CHAN
2760 5773

GE
(Group 3)

Complex

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package H, Landslip Prevention and Mitigation Works - Investigation, Design and Construction
(BIM)

I, DC

2018 Q4

91 months

Mr. Chris
C. W. CHAN
2760 5773

GE
(Group 3)

Complex

-

Management and Operation of Public Works Regional Laboratory (North Lantau) to Provide Fill Compaction Control and Other Construction Materials Compliance Testing Services – Design and Construction

DC

2018 Q4

50 months

Mr. M. K. LEE
2305 1105

GE
(Group 2 / 3)

Normal

-

Management and Operation of Public Works Regional Laboratory (Kowloon) to Provide Fill Compaction Control and Other Construction Materials Compliance Testing Services - Design and Construction

DC

2018 Q4

50 months

Mr. M. K. LEE
2305 1105

GE
(Group 2 / 3)

Normal

5101CX

Technical Study on Volcanic Rock Resources for Construction Use in Hong Kong – Feasibility Study

FS

2018 Q4

24 months

Mr. Roy
K. C. HUNG
2716 8686

GE
(Group 3)

Complex

B100HX

Site Formation and Infrastructure Works for Public Housing Developments at Cheung Muk Tau - Investigation, Design and Construction
(BIM)

I, DC

2018 Q4

94 months

Mr. Simon
M. L. TSO
2762 5638

CE
(Group 2 / 3)

Normal

5101CX

Improvements to the Internal Slip Roads at Wo Hop Shek Cemetery that are required to support Phases 2 and 3 Columbarium Development - Investigation, Design and Construction
(BIM)

I, DC

2019 Q1

114 months

Mr. Daniel
K. L. MAN
2762 5622

HY
(Group 2 / 3)

Normal

7100CX

Urban design study for the future town centre near the proposed Hung Shui Kiu Station and the district commercial node near the existing Tin Shui Wai Station in Hung Shui Kiu New Development Area – Feasibility Study
(NEC PSC)

FS

2019 Q1

24 months

Ms. Wilda
H. Y. LEE
2158 5620

TP
(Group 2)

Complex

Notes:

  • The Forecast of Consultancies (the "Forecast") is published in good faith taking into consideration the construction industry's request. The Government of Hong Kong Special Administrative Region (the "Government") does not guarantee that submission of expression of interest and/or technical and fee proposal(s) will be invited for any particular listed consultancy(ies), either at the time stated in the Forecast or at any time. The information published in the Forecast may be revised at any time. Consultants shall refer to the relevant invitation documents for the exact details of each consultancy. The Government will not be responsible for any loss or damage whatsoever arising out of or in connection with the use of or reference to the information published in the Forecast.
  • The preliminary date of inviting expression of interest / proposals in the Forecast refers to the probable date of inviting expression of interest from longlisted consultants for a consultancy if two-stage consultant selection process is adopted, or the probable date of inviting technical and fee proposals from an initial list of consultants for a consultancy if one-stage consultant selection process is adopted.
  • The following abbreviations are used in the Forecast:

Abbreviations:


(i) Types of Consultancy Agreements

  FS  -  Feasibility Study
  I  -  Investigation
  D  -  Design
  C  -  Construct
  DC  -  Design & Construct

(ii) Categories of Architectural and Associated Consultants

  Arch  -  Architectural
  BS  -  Building Services
  BV  -  Building Surveying
  LA  -  Landscape Architectural
  QS  -  Quantity Surveying
  SE  -  Structural Engineering
  SP  -  Specialists

(iii) Categories of Engineering and Associated Consultants

  CE  -  Civil Infrastructure and Development
  DS  -  Drainage and Sewerage
  EM  -  Electrical and Mechanical
  EP  -  Environmental
  GE  -  Geotechnical and Slope
  HY  -  Roads and Associated Structures
  TP  -  Town Planning
  TT  -  Traffic and Transport
  WS  -  Waterworks
  SP  -  Specialists

(iv) Other Information

  BIM  -  Building Information Modelling
  NEC PSC  -  New Engineering Contract Professional Service Contract
  TBC  -  To be confirmed
  N.A.  -  Not applicable