Tender Reference :
Contract No.: YL/2025/01Procuring Department :
Civil Engineering and Development DepartmentSubject :
Development of the Loop: Main Works Package 1 – Contract 5 – Sewage Treatment Facilities and Other Infrastructure WorksDescription :
The works mainly include:
- design and construction of a sewage treatment works with a treatment capacity of 18,000 cubic metres per day;
- design and construction of a sewage pumping station with a pumping capacity of 22,000 cubic metres per day;
- design and construction of a riverside promenade and a river edge in district open space;
- construction of roadworks and the associated drainage, sewerage, and waterworks at Road D1 and Road L1;
- implementation of environmental mitigation measures and environmental monitoring works; and
- other ancillary works.
The works commenced on 12 November 2026 for completion in 2031 tentatively.