| CE 14/2026 (GE) |
Management and Operation of Public Works Regional Laboratory (Tai Po) - Design and Construction |
Fugro (Hong Kong) Limited |
27/08/2026 |
01/09/2026 |
30/11/2030 |
HK$27,542,750.00 |
| CE 15/2026 (GE) |
Management and Operation of Public Works Regional Laboratory (Tin Shui Wai) - Design and Construction |
C M Wong & Associates Limited |
27/08/2026 |
01/09/2026 |
30/11/2030 |
HK$26,800,000.00 |
| CE 13/2026 (GE) |
Pilot Study on Application of Robotic Process Automation on Geotechnical Works Design Optimization and Verification – Feasibility Study |
Asia Infrastructure Solutions Limited |
12/08/2026 |
17/08/2026 |
16/02/2029 |
HK$23,800,000.00 |
| CE 16/2026 (CE) |
Hung Shui Kiu/Ha Tsuen New Development Area Remaining Phase Development and Lau Fau Shan New Development Area Phase 1 Development – Design and Construction |
Arup-AtkinsRéalis Joint Venture |
06/08/2026 |
10/08/2026 |
31/08/2039 |
HK$148,000,002.00 |
| CE 1/2026 (CE) |
The Establishment of an Agricultural Park (Phase 2 Stage 1) and Associated Infrastructure Works in Kwu Tung South - Design and Construction |
Mott MacDonald Hong Kong Limited |
13/07/2026 |
17/07/2026 |
17/09/2034 |
HK$14,980,000.00 |
| CE 39/2025 (CE) |
Reclamation at Lung Kwu Tan - Design and Construction |
Ove Arup & Partners Hong Kong Limited |
25/06/2026 |
30/06/2026 |
29/06/2036 |
HK$43,500,000.00 |