Widening of Tai Po Road (Sha Tin Section)
Widening of Tai Po Road (Sha Tin Section)

Brief Description of Project Scope:

The project is to widen Tai Po Road (Sha Tin Section) between Sha Tin Plaza and Man Wo House and implement noise mitigation measures so as to alleviate the traffic congestion and noise impact.

Approved Project Estimate:

About $2.7 billion


Related Website:

https://wtprst.hk


Current Progress:

The construction works commenced in July 2018 for completion in 2023.


Project Office in Civil Engineering and Development Department:

North Development Office (Enquiry: 3512 3500)


Consultant:

AECOM Asia Company Limited


Contract:

Contract No. NE/2017/05
Scope: The works comprise widening of about 1.1 kilometre long of Tai Po Road (Sha Tin Section) between Sha Tin Plaza near Sha Tin Rural Committee Road (STRCR) and Man Wo House near Fo Tan Road from dual two-lane to dual three-lane carriageway; modification to the existing STRCR Interchange and two existing footbridges; as well as provision of noise barriers, traffic control and surveillance system and the associated works.
Commencement Date: 27 July 2018
Completion Date: 2023
Contract Sum: $1.6 billion
Contractor: China Railway – China Railway First Group – Zhen Hua Engineering Joint Venture