Tung Chung New Town Extension - Reclamation and Advance Works

Project Number:

7814CL
Attachment 1Attachment 2Attachment 3

Brief Description of Project Scope:

The scope of the project comprises:
(a) reclamation of the seabed by a non-dredged method at Tung Chung East to form a total of about 130 hectares of land;
(b) construction of about 4.9 kilometres of seawalls, with an eco-shoreline, three drainage box culvert outfalls, three circulation drains and a seawater intake;
(c) construction of a 470 metre long multi-cell drainage box culvert at Tung Chung East;
(d) provision of infrastructure for Tung Chung Area 58, including construction of a single two-lane road with a footpath of about 270 metre in length and the associated utility works; and
(e) implementation of environmental mitigation measures and an environmental monitoring and audit programme for the works mentioned in (a) to (d) above.

Project Office in Civil Engineering and Development Department:

South Development and Sustainable Lantau Office (Enquiry: 2231 4408)

Consultant:

AECOM Asia Company Limited

Approved Project Estimate:

$20,210 million

Related Website:

http://www.tung-chung.hk/

Current Progress:

The works commenced on 29 December 2017 and are on schedule.

Contract:

Contract No. NL/2017/03
Scope: Same as project scope above
Commencement Date: 29 December 2017
Completion Date: 2023
Contract Sum: About $12,076 million
Contractor: Build King - SCT Joint Venture

Environmental Monitoring and Audit Information:

http://env.tcnte.hk/

Back