West Kowloon Reclamation – main works (remainder) – footbridge at the junction of Sham Mong Road and Tonkin Street West in Sham Shui Po

Project Number:

7801CL
Attachment 1

Brief Description of Project Scope:


The scope of the project comprises:

  1. a covered four-span footbridge system at the junction of Sham Mong Road and Tonkin Street West, with length of each span ranging from about 46 metres (m) to 67 m (235 m long in total) and the clear width ranging from about 4.0 m to 4.7 m;
  2. six lifts, four covered escalators, two covered staircases and direct connections linking the proposed footbridge system with future adjacent developments;
  3. associated road works and ancillary works including a temporary covered staircase, footpaths, drainage, utilities, electrical and mechanical and landscaping works; and
  4. necessary environmental mitigation measures.

Cost:

$368.9 million

Completion Date:

30 December 2019

Project Office in Civil Engineering and Development Department:

South Development Office (Enquiry: 3842 7062)

Other Related Information:

Scheme / Amendments of Scheme / Authorization of Scheme
Gazette Date Subject
8 APR 2016 and
15 APR 2016

Authorization of Scheme