Footbridge across Hip Wo Street near the junction of Hip Wo Street/Mut Wah Street
Project Number:
7195TBBrief Description of Project Scope:
The scope of the project comprises:
- construction of a 4 to 6-metre wide footbridge, with an about 39-metre long curved main deck, and two arms of about 6 and 13-metre long respectively;
- construction of a lift and a staircase; and
- ancillary works including footpath construction, drainage and utilities works, landscaping works, and related electrical and mechanical works.