Ma On Shan development - roads, drainage and sewerage works at Whitehead and Lok Wo Sha Phase 1

Project Number:

7718CL
Attachment 1

Brief Description of Project Scope:

Construction of dual two-lane carriageways of approximately 350 metres (m); a single two-lane carriageway of approximately 630m long; an access road of approximately 280m long connecting to the future sewage pumping station; a drainage culvert of approximately 500m long; formation of sites of a total area of 2.7 hectares; realignment of an existing access road of approximately 110m long; temporary or permanent closure of certain sections of existing carriageways and footpaths/tracks; construction of pressurized sewers of a total length of approximately 800m; gravity sewers of a total length of approximately 730m; a sewage pumping station and associated footpaths, cycle tracks, retaining walls and amenity areas.

Cost:

$152 million

Completion Date:

January 2012

Project Office in Civil Engineering and Development Department:

North Development Office
Back