PWP Item No. Contract No. & Title of Contract Probable Date of Gazettal / Inviting Tenders Works Category & Lowest Group Permitted to Tender Range of Estimate of Cost Name and Tel. No. of Contact Person

5290RS

Contract No. IS/2017/01
Construction of Mountain Bike Training Ground and Expansion of Mountain Bike Trail Networks in Mui Wo and Chi Ma Wan, South Lantau

(NEC ECC Opt B)

Jul 2017

SF
Group B

M1

Mr Eddie W C LAM
2231 4445

7872TH

Contract No. NE/2017/02
Tseung Kwan O-Lam Tin Tunnel – Road P2/D4 and Associated Works

(NEC ECC Opt D)

Jul 2017

RD
Group B

M3

Mr L C CHEUNG
2301 1385

5001BX

Contract No. GE/2015/03
Landslip Prevention and Mitigation Programme, 2011, Package H, Landslip Prevention and Mitigation Works

Jul 2017

LANP

M2

Mr Y K HO
2762 5400

5001BX

Contract No. GE/2017/07
Landslip Prevention and Mitigation Programme, 2014, Package I, Landslip Prevention and Mitigation Works

Jul 2017

LANP

M2

Dr H W SUN
2762 5300

5001BX

Contract No. GE/2017/26
Landslip Prevention and Mitigation Programme, 2015, Package B, Landslip Prevention and Mitigation Works

Jul 2017

LANP

M1

Dr H W SUN
2762 5300

5001BX

Contract No. GE/2017/23
Landslip Prevention and Mitigation Programme, 2015, Package C, Landslip Prevention and Mitigation Works

Aug 2017

LANP

M1

Dr Dominic O K LO
2760 5811

5001BX

Contract No. GE/2017/09
Landslip Prevention and Mitigation Programme, 2013, Package E, Landslip Prevention and Mitigation Works

Aug 2017

LANP

M1

Mr Terence T M LAM
2762 5444

5001BX

Contract No. GE/2017/19
Landslip Prevention and Mitigation Programme, 2015, Package D, Landslip Prevention and Mitigation Works

Aug 2017

LANP

M1

Mr Y LAM
2762 5469

5001BX

Contract No. GE/2016/10
Landslip Prevention and Mitigation Programme, 2012, Package D, Landslip Prevention and Mitigation Works

Sep 2017

LANP

M2

Mr Y LAM
2762 5469

5001BX

Contract No. GE/2018/04
Landslip Prevention and Mitigation Programme, 2013, Package F, Landslip Prevention and Mitigation Works (Batch 2)

Sep 2017

LANP

M1

Mr Y LAM
2762 5469

5001BX

Contract No. GE/2017/29
Landslip Prevention and Mitigation Programme, 2015, Package H, Landslip Prevention and Mitigation Works

Sep 2017

LANP

M1

Dr H W SUN
2762 5300

-

Contract No. GE/2017/12
Ground Investigation – New Territories East

(NEC TSC Opt A)

Sep 2017

GROU
Group II

M1

Dr H W SUN
2762 5300

5001BX

Contract No. GE/2018/05
Landslip Prevention and Mitigation Programme, 2015, Package G Landslip Prevention and Mitigation Works

Oct 2017

LANP

M1

Mr Terence T M LAM
2762 5444

5758CL

Contract No. CV/2017/02
Development of Columbarium at Sandy Ridge Cemetery - Infrastructural Works at Man Kam To Road and Lin Ma Hang Road

(NEC ECC Opt B)

Oct 2017

RD
Group C

M4

Mr Louie C T LAU
2762 5656

-

Contract No. CV/2017/03
Operation and Maintenance of Public Fill Reception Facilities in Chai Wan and Mui Wo (2018 – 2023)

(NEC TSC Opt A)

Nov 2017

SF or PW
Group B

M2

Mr C K LAM
2762 5588

5001BX

Contract No. GE/2018/03
Landslip Prevention and Mitigation Programme, 2012, Package C Landslip Prevention and Mitigation Works in Lantau and Hong Kong Island

Nov 2017

LANP

M2

Mr Terence T M LAM
2762 5444

7872TH

Contract No. NE/2017/06
Tseung Kwan O – Lam Tin Tunnel –Traffic Control and Surveillance System and Associated Works

Dec 2017

NA

M3

Mr W T CHAU
2301 1504

5001BX

Contract No. GE/2017/21
Landslip Prevention and Mitigation Programme, 2016, Package C, Ground Investigation for Landslip Prevention and Mitigation Works

(NEC TSC Opt A)

Dec 2017

LANP

M1

Mr Y LAM
2762 5469

5001BX

Contract No. GE/2017/24
Landslip Prevention and Mitigation Programme, 2015, Package E, Ground Investigation for Landslip Prevention and Mitigation Works

(NEC TSC Opt A)

Dec 2017

LANP

M1

Mr Y LAM
2762 5469

-

Contract No. GE/2018/06
Ground Investigation – New Territories West

(NEC TSC Opt A)

Apr 2018

GROU
Group II

M1

Dr H W SUN
2762 5300

Notes:

  • The Forecast of Invitations to Tender is issued in good faith, but in no way indicates that tenders will be invited for the particular projects listed either at the time stated or at any time, and Government accepts no responsibility whatsoever for any loss or expenses that may be incurred as a result of the publication of the Forecast.
  • The Forecast of Invitations to Tender is updated in January, April, July and October of a year.
  • Unless otherwise stated, the date given in column 3 is the probable date for gazetting or inviting tenders. Tenders called by invitation, instead by gazettal, are marked with a *.
  • Contracts to be proceeded by Design & Build is indicated by (D&B) in column 4.
  • To be eligible to tender Contractors must be in the appropriate LIST/CATEGORY/GROUP indicated in the Invitations to Tender.
  • Details of the rules for administration of the List of Approved Contractors for Public Works are described in Contractor Management Handbook Revision B.
  • The following abbreviations are used in the Forecast:

  DEMO  -   Demolition of Various of Structures
  GROU  -   Ground Investigation Field Work
  LAND   -   Land, Engineering and Hydrographic Survey Services
  LANP   -   Landslip Preventive/Remedial Works to Slopes/Retaining Walls
  LANS   -   Landscaping
  NA       -   Not Applicable
  OTHE   -   Others
  PILE     -   Land Piling
  PQ        -   Pre-qualification
  PQT      -   Pre-qualified Tenderers
  PW       -   Port Works
  RD        -   Roads and Drainage
  RT        -   Restricted Tender
  SC        -   Specialist Contractors
  SF        -   Site Formation
  SOIL    -    Soil and Rock Testing
  ST        -    Selective Tendering
  WW     -    Waterworks
  M1       -    Up to $100 million (estimated cost)
  M2       -    From $100 million, to $200 million (estimated cost)
  M3       -    From $200 million, to $300 million (estimated cost)
  M4       -    Exceeding $300 million (estimated cost)