7861TH

Independent Environmental Checker (IEC) for Road Widening and Retrofitting Noise Barriers on Tai Po Road (Sha Tin Section)

C

Apr 2018*

75 months

Mr Andrew K W

CHEUNG

3152 3500

5101CX

Improvements to the Internal Slip Roads at Wo Hop Shek Cemetery that are required to support Phases 2 and 3 Columbarium Development – Investigation, Design and Construction
( BIM)

I, DC

Jun 2018

106 months

Mr Daniel K L

MAN

2762 5622

-

Management and Operation of Public Works Regional Laboratory (Tin Shui Wai) to Provide Fill Compaction Control and Other Construction Materials Compliance Testing Services - Feasibility Study

FS

Jun 2018

50 months

Mr. M. K. LEE

2305 1105

-

Management and Operation of Public Works Regional Laboratory (Tai Po) to Provide Fill Compaction Control and Other Construction Materials Compliance Testing Services - Feasibility Study

FS

Jun 2018

50 months

Mr. M. K. LEE

2305 1105

5101CX

Relocation of Kowloon Bay Public Works Central Laboratory to Caverns – Feasibility Study

FS

Jun 2018

24 months

Mr Patrick K S

CHAU

2760 5780

7100CX

Development of remaining housing sites in Yuen Long Areas 13 and 14 – Feasibility Study
( NEC PSC)

FS

Aug 2018

18 months

Ms Y Y NG

2158 5617

7100CX

River revitalisation and flood attenuation facilities for Hung Shui Kiu New Development Area – Feasibility Study
( NEC PSC)

FS

Sep 2018

24 months

Ms H Y LEE,

Wilda

2158 5620

5001BX

Study of Landslides Occurring on Hong Kong Island and Outlying Islands between 2019 and 2021 – Feasibility Study

FS

2018 Q3

48 months

Ms. Rachel H C

LAW

2762 5051

5001BX

Study of Landslides Occurring in Kowloon and the New Territories between 2019 and 2021 – Feasibility Study

FS

2018 Q3

48 months

Ms. Rachel H C

LAW

2762 5051

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package A, Landslip Prevention and Mitigation Works - Investigation, Design and Construction

I, DC

2018 Q3

66 months

Mr Chris C W

CHAN

2760 5773

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package B, Landslip Prevention and Mitigation Works - Investigation, Design and Construction

I, DC

2018 Q3

66 months

Mr Chris C W

CHAN

2760 5773

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package C, Landslip Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Hong Kong Island West - Investigation, Design and Construction

I, DC

2018 Q3

75 months

Mr Chris C W

CHAN

2760 5773

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package D, Landslip Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Hong Kong Island East - Investigation, Design and Construction

I, DC

2018 Q3

75 months

Mr Chris C W

CHAN

2760 5773

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package E, Landslip Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Mainland East (North) - Investigation, Design and Construction

I, DC

2018 Q4

75 months

Mr Chris C W

CHAN

2760 5773

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package F, Landslip Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Mainland East (South) - Investigation, Design and Construction

I, DC

2018 Q4

75 months

Mr Chris C W

CHAN

2760 5773

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package G, Landslip Prevention and Mitigation Works - Investigation, Design and Construction
( BIM)

I, DC

2018 Q4

91 months

Mr Chris C W

CHAN

2760 5773

5001BX

Landslip Prevention and Mitigation Programme, 2018, Package H, Landslip Prevention and Mitigation Works - Investigation, Design and Construction
( BIM)

I, DC

2018 Q4

91 months

Mr Chris C W

CHAN

2760 5773

B100HX

Site Formation and Infrastructure Works for Public Housing Developments at Cheung Muk Tau – Investigation, Design and Construction
( BIM)

I, DC

2018 Q4

110 months

Mr Simon M L

TSO

2762 5638

-

Management and Operation of Public Works Regional Laboratory (North Lantau) to Provide Fill Compaction Control and Other Construction Materials Compliance Testing Services - Feasibility Study

FS

Dec 2018

50 months

Mr. M. K. LEE

2305 1105

-

Management and Operation of Public Works Regional Laboratory (Kowloon) to Provide Fill Compaction Control and Other Construction Materials Compliance Testing Services - Feasibility Study

FS

Dec 2018

50 months

Mr. M. K. LEE

2305 1105

Notes:

  • The Forecast of Consultancies is issued in good faith, but in no way indicates that consultancies will be invited for the particular projects listed, either at the time stated or at any time, and Government accepts no responsibility whatsoever for any loss or expenses that may be incurred as a result of publication of the Forecast.
  • The Forecast of Consultancies is updated in January, April, July and October of a year.
  • The date in Column 4 of the Forecast refers to the probable date of inviting the submission of Expressions of Interest from consultants longlisted for a Project. Consultancies which are suitable for small consultants are marked with a *.
  • # - planned for direct invitation of Technical and Fee Proposals (i.e. No EOI)
  • * - consultancies which are suitable for small consultants
  • The following abbreviations are used in the Forecast:-

  C         -    Construct
  D         -    Design
  DC      -    Design & Construct
  FS       -    Feasibility Study
  I          -    Investigation
  PD      -    Preliminary Design
  PPFS  -    Preliminary Project Feasibility Study