New Territories East Development Office |
| |
 |
Project Number: |
6694TH/A (Part) |
Project Title: |
Sha Tin Heights Tunnel and Approaches |
Estimated Project Cost: |
$1380 million |
 |
| To view or download the following document, please download Acrobat Reader. |
|
Brief Description of Project Scope: |
This project consists of about 1 km of road tunnel and the Sha Tin toll plaza formation together with connecting roads to Road T3 and slip roads to Che Kung Miu Road. |
Current Project Progress: |
The project has been substantially
completed and the roads were opened to the public
on 21 March 2008. |
Contract: |
| Contract No. ST89/02 |
| Scope |
(a) site formation, drainage, geotechnical and landscape works for the toll plaza;
(b) construction of approximately 1 km of 3-lane twin-bore tunnel underneath Sha Tin Heights;
(c) construction of a dual 2-lane at-grade carriageway of about 0.7 km linking the Sha Tin Heights Tunnel and Road T3;
(d) construction of slip roads connecting to Che Kung Miu Road; and
(e) construction of noise mitigation measures.
|
| Commencement Date |
Nov 2002 |
| Completion Date |
September 2007 |
| Estimated Value |
$1195 million |
| Current Progress |
The works are substantially completed |
| Contractor |
Mr. C. Y. Mak
China State - China Railway Joint Venture
Telephone: 2601 7982 |
| Resident Engineer |
Mr. David Kwan, AECOM Asia Company Limited
Chief Resident Engineers Office
7900 Tai Po Road, Sha Tin Heights
New Territories
Telephone: 2697 4683 |
|
Contact: |
CEDD
Suite 1213 Chinachem Golden Plaza, 77 Mody Road, Tsim Sha Tsui East, Kowloon
Mr. MA Siu Man (Tel :23011383)
Consultants
AECOM Asia Company Limited
8/F, Grand Central Plaza, Tower 2, 138 Sha Tin Rural Committee Road, Sha Tin, NT, Hong Kong |
|
|
| |
 |