Widening of Tai Po Road (Sha Tin Section)
Widening of Tai Po Road (Sha Tin Section)

Brief Description of Project Scope:

The project involves widening of about 1.1km of the existing Tai Po Road (Sha Tin Section) between Sha Tin Rural Committee Road near Sha Tin Plaza and Fo Tan Road near Man Wo House of Wo Che Estate in order to cope with the anticipated increase of traffic demand. The project comprises:

  1. widening of about 1.1km of Tai Po Road (between Sha Tin Rural Committee Road and Fo Tan Road) from dual-2 lane to dual 3-lane;
  2. modification of Sha Tin Rural Committee Road bridge;
  3. modification of the footbridges NF 40 &NF66; and
  4. carrying out associated drainage works, landscape works, noise mitigation measures, street lighting works and traffic control and surveillance system.

Related Website:

http://wtprst.hk


Current Progress:

The investigation study for the Project has been substantially completed.

The consultancy assignment for design and construction of the project commenced in December 2015.

The proposed road works were authorized for execution. The relevant notice was published in the Gazette on 4 December 2015.


Project Office in Civil Engineering and Development Department:

North Development Office (Contact Number: 3106 2764)


Consultant:

AECOM Asia Company Limited