Kai Tak development – stages 3B and 5A infrastructure works at former north apron area
Stage 3B Infrastructure Works Stage 5A Infrastructure Works

Brief Description of Project Scope:

The scope of Stage 3B infrastructure works comprises the following major items:
  1. construction of a section of dual two-lane Road L2 of about 320 metres (m) long connecting Shing Kai Road with Concorde Road, and a pair of single-lane slip roads of about 650 m long linking the eastbound Prince Edward Road East (PERE) with San Po Kong;
  2. construction of an elevated landscaped walkway LW4 of about 290 m long across PERE connecting San Po Kong and Kai Tak Development (KTD);
  3. demolition of existing flyover K9 in San Po Kong across PERE;
  4. construction of a pedestrian subway SW4 of about 180 m long across PERE, Kwun Tong Bypass and Shing Kai Road connecting Choi Hung Estate and KTD;
  5. road modification works in San Po Kong area;
  6. construction of associated footpaths, street lighting, traffic aids, drainage, sewerage, water mains, landscaping and ancillary works; and
  7. implementation of environmental mitigation measures and related environmental monitoring and audit (EM&A) programme.

The scope of Stage 5A infrastructure works comprises the following major items:
  1. construction of a single two-lane Road L7 of about 140 m long and a section of dual two-lane Road D1 of about 470 m long connecting with Concorde Road;
  2. construction of a single-lane slip road S15 of about 160 m long linking the proposed Road D1 with existing flyover K72 for connection with PERE eastbound;
  3. construction of a pedestrian subway SW6 of about 120 m long across PERE connecting the future preservation corridor for the Lung Tsun Stone Bridge remnants in KTD and Shek Ku Lung Road Playground;
  4. construction of associated footpaths, street lighting, traffic aids, drainage including about 830 m long box culverts, sewerage, water mains, landscaping and ancillary works; and
  5. implementation of environmental mitigation measures and related EM&A programme.

Approved Project Estimate:

$2.152 billion


Current Progress:

Kai Tak Development - Stage 3B and Stage 5A - infrastructure works at north apron area of Kai Tak Airport commenced on 30 December 2016 and 28 September 2016 respectively and the works are on schedule.

Project Office in Civil Engineering and Development Department:

East Development Office (Enquiry: 2301 1393)


Consultant:

Ove Arup & Partners Hong Kong Limited and AECOM Asia Company Limited


Contract:

Contract No. KL/2015/02
Scope: Same as project scope for the Stage 5A above
Commencement Date: 28 September 2016
Completion Date: End 2020
Contract Sum: $586 million
Contractor: Peako – Wo Hing Joint Venture

Contract No. KL/2015/03
Scope: Same as project scope for the Stage 3B above
Commencement Date: 30 December 2016
Completion Date: End 2020
Contract Sum: $553 million
Contractor: Build King - Richwell Engineering Joint Venture