Achievements of the Geotechnical Engineering Office on Landslip Prevention and Mitigation

Since 1977, the Geotechnical Engineering Office has spent about $21.5 billion (as of 31 March 2017) on landslip prevention and mitigation studies and works. Until 2010, the work was undertaken under a Landslip Preventive Measures Programme (LPMP) and a rolling Landslip Prevention and Mitigation Progamme (LPMitP) was launched in 2010 to dovetail with the LPMP to control the landslide risk in Hong Kong. Up to end 2016, about 5,580 government man-made slopes were upgraded and safety screening studies for about 5,800 private slopes were completed which resulted in the issue of Dangerous Hillside Order to the private owners of more than 2,980 potentially substandard private slopes for follow up studies and works. The overall landslide risk arising from man-made slopes had been reduced to less than 25% of that in 1977. Systematic studies of vulnerable natural hillside catchments affecting existing buildings and major transport corridors and implementation of the necessary risk mitigation measures has commenced in 2010.

To pursue Government’s greening policy, the GEO makes every effort to provide vegetation covers to slopes and natural hillsides together with the landslip prevention and mitigation works. If greening is not practicable, appropriate landscape measures will be applied to make the slopes and hillside mitigation measures blend in with the environment. On average, about 300,000 plants are planted each year. Some examples of greened slopes are shown below.

 

Location: South Lantau Road

substandard slope at South Lantau Road Substandard Slope
up-to-standard green slope at South Lantau RoadUp-to-Standard Green Slope


Location: Sai Yeung Choi Street

substandard slope at Sai Yeung Choi Street Substandard Slope
up-to-standard green slope  at Sai Yeung Choi Street Up-to-Standard Green Slope